Skip to content

5.2 Run Simulation and Review Results

The user should review the simulation outputs after the run is complete.

Validation Steps

  1. Open the voltage result page.
  2. Open the SOC result page.
  3. Open the current result page.
  4. Open the error result page.
  5. Compare the predicted output with the expected trend.

Expected Result

The software should display voltage, SOC, current, and error results in a consistent way.

Acceptance Check

  • All result pages are available.
  • The plotted curves are physically reasonable.
  • The results are consistent with the validated parameters.