Skip to content

2.3 Column Mapping Validation

The user must confirm that the uploaded files are mapped to the correct columns.

Validation Steps

  1. Open the column mapping page.
  2. Verify that Time, Voltage, Current, Capacity and Temperature columns are assigned correctly.
  3. Check that the OCV file is mapped as the OCV dataset.
  4. Check that the charge and discharge datasets are mapped correctly.
  5. Click the validation or continue button.

Expected Result

The mapping should be accepted and the workflow should proceed to the characterization stage.

Acceptance Check

  • No missing or duplicate column mapping is reported.
  • The user can proceed to the next stage without a warning.
  • The imported data appears consistent with the expected time series.